East-West Canal
From TBD Enterprises
Line 8: | Line 8: | ||
== Route == | == Route == | ||
− | + | [[User:Float]] will decide on the eastern route past [[The Chateau]]. | |
− | + | ||
+ | == Water Physics == | ||
+ | |||
+ | The western portion is dug and hatched for quick filling. | ||
+ | However, water physics are currently broken for multiplayer. | ||
+ | We'll either get around to installing a mod or the stock server will be fixed. | ||
+ | |||
[[Category:Proposed Projects]] | [[Category:Proposed Projects]] |