East-West Canal
From TBD Enterprises
(Proposing east-west canal extension) |
|||
Line 10: | Line 10: | ||
The western route to Clinton will require some tunnelling, a route that will have nearly the shortest possible | The western route to Clinton will require some tunnelling, a route that will have nearly the shortest possible | ||
tunnel is currently marked with torches. | tunnel is currently marked with torches. | ||
+ | [[Category:Proposed Projects]] |